Percentage-of-Completion Accounting for Construction Companies

An introduction to percentage-of-completion accounting, job costing, WIP reporting, estimated costs to complete, and long-term contract considerations.

A laptop showing a building under construction beside a hard hat, cranes through the window

Why Long-Term Contracts Require Special Attention

Construction companies often begin a project in one tax year and finish it in another.

That creates an important accounting and tax question:

When should the project's revenue and profit be recognized?

IRC §460 generally requires certain long-term contracts to use the percentage-of-completion method (PCM) for federal income tax purposes, although exceptions can apply, including rules for certain home construction contracts and qualifying small contractors.

How Percentage-of-Completion Works

Under PCM, income is recognized as work progresses rather than waiting until the project is finished.

A common cost-to-cost calculation is:

Costs Incurred to Date ÷ Estimated Total Contract Costs = Percentage Complete

That percentage can then be used in determining the amount of contract revenue and gross profit recognized.

Example

Assume:

  • Contract price: $2,000,000
  • Estimated total cost: $1,600,000
  • Costs incurred to date: $800,000

The project is approximately:

$800,000 ÷ $1,600,000 = 50% complete

The accounting system therefore needs reliable estimates of both costs incurred and expected costs to complete.

Why Accurate Job Costing Matters

Percentage-of-completion accounting is only as reliable as the underlying job-cost information.

Construction companies should maintain accurate records for:

  • Direct labor
  • Materials
  • Subcontractors
  • Equipment
  • Allocated costs
  • Change orders
  • Estimated costs to complete

Poor job costing can distort revenue recognition and project profitability.

Work in Progress Reporting

A strong WIP schedule can help management compare:

  • Contract Value
  • → Costs Incurred
  • → Estimated Cost to Complete
  • → Percentage Complete
  • → Revenue Recognized
  • → Billings
  • → Expected Gross Profit

This isn't only a tax-compliance exercise. It can help owners identify deteriorating margins and problematic projects earlier.

Look-Back Rules

Certain contracts accounted for under PCM may also be subject to the §460 look-back rules after completion. Form 8697 is used in applicable circumstances to calculate interest due or refundable when actual contract results differ from prior estimates.

At Akato & Associates, we help construction and A&E businesses strengthen job-cost accounting, WIP reporting, and tax planning around long-term contracts.

Share this article

This material is provided for general information only and does not constitute accounting, tax or legal advice. It does not take account of your particular circumstances. Contact the firm before acting on anything you read here.

Talk it through with a licensed CPA.

Schedule a Consultation